Abdul Rouf, I. and Donoriyanto, D. S. (2025) “Optimization of Preventive maintenance with Downtime and Setup Time Using Goal Programming Method at XY Sugar Factory”, Tekmapro, 20(1). Available at: https://tekmapro.upnjatim.ac.id/index.php/tekmapro/article/view/897 (Accessed: 9March2025).